05/20/2006
LRS1997
114302546 - 7000
ELS Construction (Pvt.) Ltd.
62/3,, Neelammahara Road,, Boralesgamuwa.
2517037, 2517365, 2519727
—
—
—
—
—
2544
1
Mould Cost For Rubber Piston
1
12,000.00
10,434.78
2
Piston with Rubber Piston
2
1,100.00
1,913.04
3
Rubberizing Charges for Piston (with Brass Ring)
2
1,000.00
1,739.13
16,200.00
18% )
2,430.00
18,630.00
Rupees Eighteen Thousand Six Hundred Thirty Only.
—